WHAT WE DO

Power is the
starting point.

The infrastructure requirements of modern digital and industrial applications are increasingly defined by energy. DWat builds the platforms where large-scale power meets scalable execution.

Designed Around Critical Infrastructure

DWat approaches infrastructure from the starting point of power availability, land, water, connectivity, and execution capability to create sites that can support large-scale hyperscale development.

Power

Grid connectivity and dedicated on-site power infrastructure designed around large-load requirements, dual-feed line routing, and substation integration.

Water

Water infrastructure considered alongside power and cooling requirements from day zero, optimizing closed-loop cycles and grey-water recycling.

Connectivity

Strategic site selection with direct access to emerging telecommunication corridors, high-capacity dark fibre paths, and data-centre clusters.

Land

Large, contiguous development parcels that allow phased expansion, robust security setbacks, and clear regulatory zoning for heavy industrial loads.

Execution

A coordinated delivery approach spanning land title acquisition, statutory approvals, government interfaces, and integrated MEP/civil construction.

Hyperscale High-Density Data Hall
Next-Gen Capacity

Hyperscale-Ready Server Architecture

Engineered for 120 MW per building with liquid-cooling distribution, resilient dual-bus electrical architecture, and zero single-points-of-failure.

120 MW Per Building
G+3 Design
400 kV Grid Power
FLAGSHIP DEVELOPMENT

Chandanvelly Data
Centre Campus

A 120.23-acre master-planned campus at Machanpalle / Chandanvelly extension in Ranga Reddy district, Telangana.

Chandanvelly Aerial Campus
120.23
Total Acres
58.63
Phase 1 Acres
720 MW
Phase 1 IT Load
400 kV
Planned Grid
6
Data Halls
2 KM
To AWS/CtrlS
MASTER PLAN —

Master Plan Accommodations

The master plan is organized as a coordinated, contiguous campus with dedicated security perimeters:

6 Data-centre buildings
configured for 120 MW each
Two High-Speed Diesel (HSD)
fuel yards for complete emergency backup
400 kV substation
situated in its own dedicated parcel
Water storage & treatment
supporting phased expansion
Wide campus circulation roads
designed for heavy equipment transport
Future expansion area
for subsequent campus phases
Campus Master Plan & Perimeter
BUILDING SPECIFICATIONS —

Engineered for High-Density Performance

Each building is engineered for high-density hyperscale requirements:

Target IT Load Per Building
120 MW
IT-Load Configuration
Floor Plate Area
19,200 m²
Total Built-Up Area Per Building
76,800 m²
(G+3 Configuration)
Hyperscale Building Architecture

Connected to a Growing Infrastructure Corridor

Chandanvelly is emerging as one of Telangana's foremost data-centre clusters. The site study highlights immediate proximity to existing and planned hyperscale campuses, including AWS and CtrlS.

Telangana Government Order (G.O. No. 850)

Administrative sanction has been issued for the construction of Radial Road-2 from ORR at Kothwalguda to NH-167N near Nacharam, covering approximately 81.15 km with a sanctioned budget of ₹5,060 crore. The DWat Chandanvelly campus features contiguous site frontage along this future arterial corridor.